PLYMOUTH, Minn., April 19, 2011 /PRNewswire via COMTEX/ —
The Mosaic Company (NYSE: MOS) announced that it has notified the United States District Court for the Middle District of Florida that it plans to conduct uplands-only mining (i.e., non-wetlands) in an area at its South Fort Meade, Florida, phosphate rock mine in Hardee County. This upland area is accessible from the approximately 200-acre area where the Company is currently mining. Mosaic plans to begin transitioning its mining operations into these uplands over the next 30 to 60 days. The South Fort Meade permit for mining wetlands issued by the U.S. Army Corps of Engineers is under review by the District Court, as recently ordered by the Eleventh Circuit Court of Appeals. The Company estimates approximately one to two years of mining potential in this upland area. Although the uplands-only mining will be less efficient than if the Company could also mine the wetlands, this transition will allow the Company to continue to produce phosphate rock and keep its workforce employed while it addresses the merits of the litigation concerning the permit for mining wetlands in the extension of the Company’s South Fort Meade mine into Hardee County. A ruling by the District Court is expected by July 2011.
POSTS
NY Times on Phosphate Mine study
Army Corps Tries to Assess Impacts of Sprawling Phosphate Operations in Fla.
http://www.nytimes.com/gwire/2011/04/14/14greenwire-army-corps-tries-to-assess-impacts-of-sprawlin-83462.html?pagewanted=all
By MANUEL QUINONES of Greenwire
Published: April 14, 2011
The Army Corps of Engineers is preparing a sweeping assessment of the environmental impacts of Florida phosphate mining in response to pleas from environmentalists and
The politicians concerned about the health of their state’s waterways.
The Go to Blog » corps’ environmental impact statement (EIS) will examine the Central Florida Phosphate District, whose 1 million or so acres sprawl across several counties east of Tampa Bay. The area is so rich in phosphates — critical ingredients in fertilizers and pesticides — that experts say it will take decades for mining companies to exhaust it.
“It’s the biggest producing region in the United States,” Stephen Jasinski, a phosphate expert with U.S. Geological Survey, said in an interview.
And assessing the area’s environmental impact figures to be a complicated endeavor, but the Army Corps, which formally announced the study earlier this year, is aiming to complete the study by next summer.
“We have what we call an aggressive schedule,” said project manager John Fellows in an interview. “Many of the other agencies we are working with are skeptical because it is a tremendous endeavor. It’s just a very long process.”
Several new mining projects proposed for the phosphate district, including an extension of the South Pasture Mine by Illinois-based CF Industries Holdings Inc. and the Ona Mine by Minnesota-based Mosaic Co., the U.S. industry leader in phosphate production and by far the largest presence in Florida.
The Ona Mine, which covers thousands of acres in Hardee County, has been stuck in the permitting process for years, and it was a major reason for the Army Corps’ areawide EIS.
The EIS represents a shift in how the corps addresses phosphate mining. The agency previously reviewed mining projects case by case, preparing environmental assessments for each project. Environmentalists found the case-by-case approach lacking, saying it provided limited oversight of phosphate mining.
“It’s such a huge powerful industry in Florida,” said Linda Young, director of the Clean Water Network of Florida. “It has never been adequately regulated.”
The Army Corps’ Fellows said his agency opted to go with the EIS in response to environmental concerns.
“As time progressed and there became greater concern about the impact of phosphate mining, these became very large environmental assessments,” Fellows said, calling the assessments “books” on impacts of individual mines.
‘Moonscape’
Companies have been mining phosphate in Florida since the late 1800s, but regulations were limited until the 1970s, said Jim Cooper, an industry watchdog who leads the Placida, Fla.-based environmental group, Protect Our Watersheds.
“It has been only in the last 30 years or so that people have been paying attention,” he said.
Cooper said phosphate-mining oversight has improved safeguards along with a willingness by environmental groups and even local governments to fight mining projects in court. For example, the permit for Mosaic’s South Fort Meade mine extension is on hold pending court review after a challenge from environmental groups.
Environmentalists say they are concerned that pollution from phosphate mining could threaten the Peace River, which flows more than 100 miles from the mining district to the Charlotte Harbor Estuary, and the Myakka River watershed. Ruin the waters, conservationists say, and a regional economy based on fisheries and tourism will shrivel.
Phosphates are strip-mined and separated from sand and clay. As phosphates are taken for processing, sand tailings are stored for reclamation and the clay slurry is pumped to large settling areas. Environmentalists say years of mining have reduced river flows and fish populations.
“It’s like a moonscape,” environmentalist Young said. “The industry has been ripping and tearing at Florida for a very long time. They have already done an amazing amount of damage.”
Environmentalists and area residents also worry about radiation released by phosphate processing, which yields large quantities of phosphogypsum — mainly calcium sulfate — that is stored in stacks that can cover hundreds of acres, according to a U.S. EPA fact sheet. That fact sheet adds that the risks associated with the stacks are “in line with acceptable risk practices.”
Herschel Morris, phosphate operations vice president for CF Industries, takes issue with activists painting his industry as destructive to the environment.
“We’ve been doing a really good job of reducing our water flows, water impacts, environmental impacts,” he said in an interview, adding that government oversight had made the industry more conscious about limiting the effect of mining.
Morris is confident in the industry’s reclamation efforts and new technologies that he said allow miners to return the land to “pristine” condition. He also touted a program to collect and treat rainwater and inject it into the aquifer.
“Everything that we touch, that we mine, we have to reclaim by law,” Morris said, “You might tell me, you know, this is so beautiful, so pristine.”
Industry claims about the quality of reclamation efforts may never convince environmentalists who say strip mining of any type causes permanent damage to the land, its waterways and surrounding ecosystem.
Cooper said he does not want to stop mining altogether but thinks mining companies are being greedy about how much material they want to extract and from where. “What you’ve got is what we consider to be overreaching by the industry,” he said.
Cooper worries about mining creeping closer to farming areas and waterways.
“Let’s come up with a plan that works best so the miners can achieve their profits,” he said. “At the same time, they protect the harbor, make the harbor sustainable.”
‘You can’t grow a crop without it’
Seven of the 12 U.S. phosphate mines are in Florida. There are others in North Carolina, Utah and Idaho, USGS said. Other significant reserves are found in China and parts of Northern Africa, with the largest deposits being in Morocco and western Sahara.
Phosphorus is vital to agriculture.
“You can’t grow a crop without it,” said Kathy Mathers, vice president of public affairs for the Fertilizer Institute, in an interview. “It’s basically a fertilizer that’s in demand around the world. In order for us to continue to grow and feed a growing population, we need to continue using fertilizer.”
Still, advocates and residents who live near phosphate mining operations wonder about the tradeoffs. Another proposed phosphate project in Idaho, Monsanto Co.’s 768-acre Blackfoot Bridge Mine, is also causing environmental concerns, including selenium pollution (Land Letter, March 31).
“We have not opposed development of mines if they do them right,” Marv Hoyt, Idaho director for the Greater Yellowstone Coalition, said in an interview. “They’re close, but they’re not there yet.”
The phosphate industry is increasingly concerned that permit delays and litigation, especially in Florida, is making it too hard for them to mine the resource and meet demand from domestic sources.
Both industry leaders and environmentalists, meanwhile, are pinning their hopes on the Army Corps’ EIS.
“I think it can be a good thing,” CF Industries’ Morris said. “It’s going to better define the effects of phosphate mining and how we impact the environment.”
But environmentalist Cooper is hoping the EIS forces the imposition of tighter regulations aimed at reducing polluted runoff. His wish: “that we’ll have better setbacks from the rivers and streams that are affected.”
“So if there is a problem,” he said, “it does not create an issue that we can’t live with.”
Copyright 2011 E&E Publishing. All Rights Reserved.
By MANUEL QUINONES of Greenwire
Published: April 14, 2011
The Army Corps of Engineers is preparing a sweeping assessment of the environmental impacts of Florida phosphate mining in response to pleas from environmentalists and
The politicians concerned about the health of their state’s waterways.
The Go to Blog » corps’ environmental impact statement (EIS) will examine the Central Florida Phosphate District, whose 1 million or so acres sprawl across several counties east of Tampa Bay. The area is so rich in phosphates — critical ingredients in fertilizers and pesticides — that experts say it will take decades for mining companies to exhaust it.
“It’s the biggest producing region in the United States,” Stephen Jasinski, a phosphate expert with U.S. Geological Survey, said in an interview.
And assessing the area’s environmental impact figures to be a complicated endeavor, but the Army Corps, which formally announced the study earlier this year, is aiming to complete the study by next summer.
“We have what we call an aggressive schedule,” said project manager John Fellows in an interview. “Many of the other agencies we are working with are skeptical because it is a tremendous endeavor. It’s just a very long process.”
Several new mining projects proposed for the phosphate district, including an extension of the South Pasture Mine by Illinois-based CF Industries Holdings Inc. and the Ona Mine by Minnesota-based Mosaic Co., the U.S. industry leader in phosphate production and by far the largest presence in Florida.
The Ona Mine, which covers thousands of acres in Hardee County, has been stuck in the permitting process for years, and it was a major reason for the Army Corps’ areawide EIS.
The EIS represents a shift in how the corps addresses phosphate mining. The agency previously reviewed mining projects case by case, preparing environmental assessments for each project. Environmentalists found the case-by-case approach lacking, saying it provided limited oversight of phosphate mining.
“It’s such a huge powerful industry in Florida,” said Linda Young, director of the Clean Water Network of Florida. “It has never been adequately regulated.”
The Army Corps’ Fellows said his agency opted to go with the EIS in response to environmental concerns.
“As time progressed and there became greater concern about the impact of phosphate mining, these became very large environmental assessments,” Fellows said, calling the assessments “books” on impacts of individual mines.
‘Moonscape’
Companies have been mining phosphate in Florida since the late 1800s, but regulations were limited until the 1970s, said Jim Cooper, an industry watchdog who leads the Placida, Fla.-based environmental group, Protect Our Watersheds.
“It has been only in the last 30 years or so that people have been paying attention,” he said.
Cooper said phosphate-mining oversight has improved safeguards along with a willingness by environmental groups and even local governments to fight mining projects in court. For example, the permit for Mosaic’s South Fort Meade mine extension is on hold pending court review after a challenge from environmental groups.
Environmentalists say they are concerned that pollution from phosphate mining could threaten the Peace River, which flows more than 100 miles from the mining district to the Charlotte Harbor Estuary, and the Myakka River watershed. Ruin the waters, conservationists say, and a regional economy based on fisheries and tourism will shrivel.
Phosphates are strip-mined and separated from sand and clay. As phosphates are taken for processing, sand tailings are stored for reclamation and the clay slurry is pumped to large settling areas. Environmentalists say years of mining have reduced river flows and fish populations.
“It’s like a moonscape,” environmentalist Young said. “The industry has been ripping and tearing at Florida for a very long time. They have already done an amazing amount of damage.”
Environmentalists and area residents also worry about radiation released by phosphate processing, which yields large quantities of phosphogypsum — mainly calcium sulfate — that is stored in stacks that can cover hundreds of acres, according to a U.S. EPA fact sheet. That fact sheet adds that the risks associated with the stacks are “in line with acceptable risk practices.”
Herschel Morris, phosphate operations vice president for CF Industries, takes issue with activists painting his industry as destructive to the environment.
“We’ve been doing a really good job of reducing our water flows, water impacts, environmental impacts,” he said in an interview, adding that government oversight had made the industry more conscious about limiting the effect of mining.
Morris is confident in the industry’s reclamation efforts and new technologies that he said allow miners to return the land to “pristine” condition. He also touted a program to collect and treat rainwater and inject it into the aquifer.
“Everything that we touch, that we mine, we have to reclaim by law,” Morris said, “You might tell me, you know, this is so beautiful, so pristine.”
Industry claims about the quality of reclamation efforts may never convince environmentalists who say strip mining of any type causes permanent damage to the land, its waterways and surrounding ecosystem.
Cooper said he does not want to stop mining altogether but thinks mining companies are being greedy about how much material they want to extract and from where. “What you’ve got is what we consider to be overreaching by the industry,” he said.
Cooper worries about mining creeping closer to farming areas and waterways.
“Let’s come up with a plan that works best so the miners can achieve their profits,” he said. “At the same time, they protect the harbor, make the harbor sustainable.”
‘You can’t grow a crop without it’
Seven of the 12 U.S. phosphate mines are in Florida. There are others in North Carolina, Utah and Idaho, USGS said. Other significant reserves are found in China and parts of Northern Africa, with the largest deposits being in Morocco and western Sahara.
Phosphorus is vital to agriculture.
“You can’t grow a crop without it,” said Kathy Mathers, vice president of public affairs for the Fertilizer Institute, in an interview. “It’s basically a fertilizer that’s in demand around the world. In order for us to continue to grow and feed a growing population, we need to continue using fertilizer.”
Still, advocates and residents who live near phosphate mining operations wonder about the tradeoffs. Another proposed phosphate project in Idaho, Monsanto Co.’s 768-acre Blackfoot Bridge Mine, is also causing environmental concerns, including selenium pollution (Land Letter, March 31).
“We have not opposed development of mines if they do them right,” Marv Hoyt, Idaho director for the Greater Yellowstone Coalition, said in an interview. “They’re close, but they’re not there yet.”
The phosphate industry is increasingly concerned that permit delays and litigation, especially in Florida, is making it too hard for them to mine the resource and meet demand from domestic sources.
Both industry leaders and environmentalists, meanwhile, are pinning their hopes on the Army Corps’ EIS.
“I think it can be a good thing,” CF Industries’ Morris said. “It’s going to better define the effects of phosphate mining and how we impact the environment.”
But environmentalist Cooper is hoping the EIS forces the imposition of tighter regulations aimed at reducing polluted runoff. His wish: “that we’ll have better setbacks from the rivers and streams that are affected.”
“So if there is a problem,” he said, “it does not create an issue that we can’t live with.”
Copyright 2011 E&E Publishing. All Rights Reserved.
FL House – Growth Management Bill Would Exempt Phosphate Mining from DRI Process
HB 7129: Growth Management (4/11/2011 PDF)
(t) Any proposed solid mineral mine and any proposed
7767 addition to, expansion of, or change to an existing solid
7768 mineral mine is exempt from this section. Proposed changes to
7769 any previously approved solid mineral mine development-of-
7770 regional-impact development orders having vested rights is not
7771 subject to further review or approval as a development-of-
7772 regional-impact or notice-of-proposed-change review or approval
7773 pursuant to subsection (19), except for those applications
7774 pending as of July 1, 2011, which shall be governed by s.
7775 380.115(2). Notwithstanding the foregoing, however, pursuant to
7776 s. 380.115(1), previously approved solid mineral mine
7777 development-of-regional-impact development orders shall continue
7778 to enjoy vested rights and continue to be effective unless
7779 rescinded by the developer. All local government regulations of
7780 proposed solid mineral mines shall be applicable to any new
7781 solid mineral mine or to any proposed addition to, expansion of,
7782 or change to an existing solid mineral mine.
7783 (u) Notwithstanding any provisions in an agreement with or
7784 among a local government, regional agency, or the state land
7785 planning agency or in a local government’s comprehensive plan to
7786 the contrary, a project no longer subject to development-of-
7787 regional-impact review under revised thresholds is not required
7788 to undergo such review.
Army Corps Solicits Comments, Please Act
This email was sent to me today by environmental activist, John Rehill, of Duette, FL. Note the before/after photographs of Bartow’s Kissengen Springs (embedded in his message)….
Army Corps of Engineers wants phosphate mining comments
The Bradenton Herald 4-12-2011
MANATEE — The U.S. Army Corps of Engineers is soliciting public comments on what should be included in an comprehensive review of phosphate mining’s impacts on Florida.The Corps plans to study mining’s environmental, socio-economic and other impacts in the Central Florida Phosphate District. The district, also known as “Bone Valley,” is a 1.3-million-acre area covering parts of Manatee, DeSoto, Hardee, Hillsborough, Polk and DeSoto counties.
Comments on the study’s scope can be made by going to the project website, www.phosphateaeis.org. The comment deadline is April 25.
Court to take second look at Mosaic permit
MANATEE — A U.S. District Court will take a second look at whether the Mosaic Company should be allowed to proceed with a 7,600-acre phosphate mining project in Hardee County.
That’s because a federal appeals court ruled Friday the district court should not have issued a preliminary injunction on the project back in July, and should take another 90 days to review a permit issued to Mosaic by the U.S. Army Corps of Engineers.
Three environmental groups, including Manasota-88 and the nationwide Sierra Club, had filed suit against the Corps and Mosaic contending the permit did not comply with the federal Clean Water Act and would damage 534 wetland acres, 26 open-water acres and 10-plus miles of streams.
Mosaic on Monday praised the appellate court’s decision to vacate the injunction as a “timely ruling,” while attorney Eric Huber of the Sierra Club said his group was “glad” the permit will be stayed for another 90 days. Meanwhile, Mosaic continues to mine 200 acres of the Hardee County site under a settlement agreement reached with the environmental groups that involves protection of 40 key acres that encompass 14.3 acres of wetlands.
The Hardee County project, known as the South Fort Meade mine, is of regional concern both because of the hundreds of jobs provided by Mosaic Co., and the pivotal environmental role of the Peace River and its tributaries that are impacted by the mining project.
http://www.phosphateaeis.org/
For those of you who wish to protect our water source, our estuaries, our rivers, wetlands and migration trails from strip-mining and the toxic environment left in it’s wake, please read this and respond by leaving a comment at the website above. If we don’t who will?
Of the many hundreds of thousands of acres that have been mined in central Florida, under 20% has experienced any form of reclamation. A Wetland is like “coral,” they are a thousand years in the making. They are a living breathing essential part of one of earths vital functions. That is to recharge our ecosystem’s ground water by filtering and percolating surface water to where it is stored for our drinking pleasures, in the aquifer. They recharge our streams, make water available for trees and habitat for migrating animals. They can only be destroyed by man they can’t be created. Any effort to do so is cosmetic at best and to be told otherwise is an insult to our intelligence. We have lost thousands of acres of wetland to phosphate mining. We don’t have that many left.
Water, the most critical element to our quality of life, is in peril and Mosaic is perched to prey on what’s left. Their sites are set on the Peace River watershed, a water source for almost 1 million people. This is not mentioned in the above article. It also doesn’t mention the river is a major source of fresh water to Charlotte Harbor, an important fishing and recreational area that also provides nursery habitat for numerous commercial and recreational fish and shellfish, and shelters species such as the West Indian manatee. The article neglects to say the headwaters also feed an estuary of national significance under the National Estuary Program and it is to be protected. That is because The Army Corp Of Engineers and SWIFTMUD have neglected to live up to that obligation and have only rubber stamped every permit that has been put before them when it came to Mosaic.
If we do not step up now and insist ACOE deny any further abuse to this last available resource of fresh water, who will?.
Mosaic is riding into this disaster on a horse called “JOBS.” I will remind you, Mosaics employs fewer workers per acre than any other occupation. Less than 3,000 employees at it’s best, on land the size of some counties. The math works out at about one worker for every 250 acres. Even national parks beat that.
Below is a park that once existed, but today is gone, history, no sign of existence, swallowed up from mining. Florida has lost many of these could-be recreational areas, recharging our economy or maybe preventing what has happened to it. But there is nothing but barren ruins.
I beg you, STOP mosaic from destroying the last bit of what Florida is. The estimated cost to the land that lay neglected is tens of billions of dollars and we are stuck with the bill. How can we get rid of our Teachers and let this GIANT corporation stick us with dead dirt and a future of peril?
I have included a list below of effects caused by phosphate mining incase one needs a subject to focus on, titled “False Fate” Please, Please, Please help us out. It will only take a few minutes.
At left, Kissengen Spring, located four miles southeast of Bartow, was a popular recreational area. It stopped flowing in 1950 due to over pumping of the aquifer in the region, largely by the phosphate industry. When the spring flowed, it discharged about 20 million gallons of water daily into a spring pool from a 17-foot deep cavern. Today the spring basin is overgrown with native and invasive plants and there’s little evidence of its former glory. Overuse of groundwater by industry, agriculture and residents in the upper and lower basins continues to cause problems in the Peace River watershed.
‘false-fate’
What does “Phosphate” mining do?
Here are some of the affects.
1- It destroys wetlands
2- It destroys stream and river water quality
3- It fractures the 10,000 year old “hardpan”
4- It destroys megatons of CO2 consuming foliage
5- It releases “Radon Gas”
6- It concentrates “uranium”
7- It drawls down the aquifer
8- It’s “runoff” overburdens estuaries
9- It’s repressive to county economic growth
10- It destroys old-growth trees
11- It’s machinery contaminates the aquifer
12- It strips the top-soil of all nutrients
13- It contributes to “sinkholes”
14- It uses huge amounts of fuel
15- It uses huge amounts of water
16- It tyrannizes surrounding property owners
17- It reduces surrounding property value
18- It employes fewer employees, per acre, than almost all other occupations
19- It corrupts local politicians
20- It poisons wells
21- It dries-up wells
22- It pollutes the air with “volatile” dust
23- It buries gopher tortoises
24- It destroys wild animal migration corridors
25- It destroys all of the native animal food-stock habitat
26- It destroys all of the grounds’ micro-flora
27- It promotes the growth of invasive plant species
28- It leaves the land to very limitable uses
29- It stores hundreds of billions of gallons of extremely toxic water behind hurricane vulnerable dikes
30- It exposes arsenic into the environment
31- It converts hectors of farmland into pits of barren topography
32- It dries up surrounding ponds
33- It uses tax revenue, externalizing operational cost to the public
34- It stinks
“Don’t let our worst habits
become our habitat”
jr.
S. Ft. Meade Mine Permit Awaits Final Ruling in Jax Fed Court
For Immediate Release – April 11, 2011
Contacts:
PERCY ANGELO, SIERRA CLUB FLORIDA PHOSPHATE COMMITTEE, (941) 698-1519
Eric E. Huber, Sierra Club Senior Staff Attorney, (303) 449-5595 ext. 101
FEDERAL COURT OF APPEALS STAYS MOSAIC’S
SOUTH FORT MEADE EXTENSION PERMIT FOR 90 DAYS WHILE SENDING
IT BACK TO DISTRICT COURT FOR FINAL RULING
Atlanta, GA — On April 8, 2011, the U.S. Court of Appeals for the Eleventh Circuit vacated a
preliminary injunction on Mosaic’s phosphate mine known as the South Fort Meade
extension. The Court of Appeals found a procedural flaw in the injunction that had been
entered July 30, 2010 by the U.S. District Court in Jacksonville based on violations of the
Clean Water Act. However, the appellate court continued the stay of Mosaic’s permit for
another 90 days and sent the matter back to the district court to make a final ruling in that
time.
Specifically the appellate court’s three page decision found that the district court
should not have remanded the permit to the U.S. Corps of Engineers when it issued its
injunction. The appellate court did not rule on the merits of the permit, i.e. it did not decide
whether the permit was legal or that it complied with the law. “We are disappointed that the
court of appeals did not affirm the injunction in its entirety,” said Eric Huber, Sierra Club
Senior Staff Attorney. “But we are glad that it stayed the permit for another 90 days which
protects the wetlands while we have another hearing in Jacksonville.”
Mosaic’s strip mine would cover 7,687 acres and destroy 534 acres of wetlands, 26
acres of open water and more than 10 miles of streams associated with the headwaters of
the Peace River and other streams. Phosphate strip mining entirely removes the land surface
down 50 or more feet, destroying wetlands and significantly impacting ground and surface
water flow. While surface reclamation occurs in theory, it is substantially delayed, often
unsuccessful and does not repair groundwater impacts. This disruption in flows affects water
quality and quantity in the watersheds involved, including the Peace River which flows into
the Charlotte Harbor Estuary, a federally recognized “aquatic resource of national
importance”.
The parties reached a partial settlement last November allowing mining to proceed at
Phase 1 of the mine, comprising some 200 acres. In return, Mosaic agreed to protect 14.3
acres of environmentally desirable and difficult to replace “bayhead wetlands,” as well as
surrounding uplands, in the upper Peace River watershed, for a total of 40.9 additional acres
protected from mining.
For more information visit www.ourphosphaterisk.com, and www.protectpeaceriver.org.
S. Ft. Meade Mine Extension – injunction overturned
PLYMOUTH, Minn., April 11, 2011 /PRNewswire via COMTEX/ —
The Mosaic Company (NYSE: MOS) announced that the United States Court of Appeals for the Eleventh Circuit has vacated a preliminary injunction previously granted by the United States District Court for the Middle District of Florida regarding Mosaic’s South Fort Meade mine. The preliminary injunction had prevented reliance on a U.S. Army Corps of Engineers’ permit for the mining of wetlands in an extension of Mosaic’s South Fort Meade, Florida, phosphate rock mine in Hardee County. The Eleventh Circuit also set aside the District Court’s remand of the permit to the Corps of Engineers.
In vacating the preliminary injunction, the Court remanded the case to the District Court for a decision on the merits to determine, after a review of the full administrative record, whether the Corps came to a rational permit decision to be analyzed through the deferential lens mandated by the Administrative Procedure Act. The Court of Appeals also directed the District Court to stay the effectiveness of the permit for 90 days to permit the District Court to make a decision on the merits based on this deferential standard.
“We appreciate this timely ruling and are pleased with the outcome and directions provided by the Eleventh Circuit,” said Richard Mack, Mosaic’s Executive Vice President and General Counsel. “We look forward to presenting our case to the District Court as mandated by the Court of Appeals. The Hardee County Extension permit was an exhaustive, multi-year effort that resulted in the most extensively reviewed and environmentally protective phosphate mining permit in Florida’s history. We expect that our ongoing operations at South Fort Meade, together with other mitigation efforts, will be sufficient to support our finished phosphate production for the 90-day period set forth by the Court of Appeals.”
Florida Trend Interactive Map – Top 10 FL landowners
This is worth checking out….
http://www.floridatrend.com/wide_article.asp?aID=54802
Florida’s Top 10 Private Landowners
1. Plum Creek Timber
2. St. Joe Co.
3. Foley Timber
4. Rayonier
5. Lykes Bros.
6. Deseret Ranches of Florida
7. Mosaic
8. Bascom Southern
9. Florida Crystals
10. U.S. Sugar
Interactive Map: Florida’s Top 10 Private Landowners & Federal and State Holdings
Theresa Woody
Senior Policy Analyst
South Florida Ecosystem Restoration Task Force
11200 SW 8th Street OE 148
Miami, FL 33199
305-348-1833 office
786-385-0075 cell
________________________________________
******************************************************************
Please note: Florida has a very broad public records law. Most written
communications to or from officials regarding county business, are public records
available to the public and media upon request. Your e-mail communications may
therefore be subject to public disclosure.
******************************************************************
Adam Cummings’ comments 2011 EPA Conference: Phosphate Mining and the Environment
Adam Cummings’ comments 2011 EPA Conference: Phosphate Mining and the Environment
https://protectpeaceriver.org/wp-content/uploads/2011/04/Altman-Recommended-Order.pdf
This document represents my recollection of my comments at the March 28 & 29 EPA Conference in Punta Gorda Florida on the “State of the Science on Phosphate Mining and the Environment” which I am submitting to become part of the public record as requested by the meeting facilitator.
As to your first question, “Is mining affecting the flows of the Peace River?” we do not need to speculate. Charlotte County proved that river flows were affected in court. (Upon returning home I checked my old documents and found on page 72 in paragraph 163 of the attached administrative law judge’s recommended order, “It is also clear that phosphate mining has historically contributed to some extent to decreased stream flow in the Peace River.” Although this order resulted in the Secretary of DEP denying the permit, a later application was approved due to an injudicious settlement by Charlotte County.)
As to your second question, “Is reclamation successful?” During earlier legal proceedings IMC chose 20 reclamation sites and Charlotte County chose 20 reclamation sites for evaluation. Of these 40 long standing reclamation sites, 39 of them no longer met DEP standards. Therefore the reclamation at the time was clearly unsuccessful. The researcher who spoke earlier clearly had it right that unless you can correct the problems in the various strata of the surficial aquifer, you will never get the reclamation right.
Furthermore, one of the things I did notice during this conference was that the economists were looking at later land uses in determining net present value and other economic impacts. In fact there appears to be ever increasing interest in urbanization of reclaimed phosphate lands as this use provided the highest economic return. Unfortunately it appears that the environmental impacts of these later land uses are not being measured as a part of the same study. Either disregard the economic benefit of any later development or include the environmental impacts that will result from that development.
The more prudent course is to consider both. As a County Commissioner I learned that impervious surface is a very important issue when trying to meet TMDL’s. As the percentage of impervious surface in my community increases, the rate of runoff increases which in turn increases the variability of freshwater flows into the estuary. It also increases the pollutant loads since there is less residence time for plants to take up nutrients and less opportunity for other pollutants to be filtered. Obviously this creates water quantity and quality problems. A typical built out urban service area in Southwest Florida can have approximately 50% impervious surface. We have been informed here that a typical successfully reclaimed mine site has about 40% impervious surface in the form of clay settling ponds. If the remaining 60% of the land becomes urbanized with 50% impervious surface that adds an additional 30% impervious surface to the existing 40% impervious surface. If we find ourselves with tens of thousands of acres at 70% impervious surface it is hard to imagine a scenario where we will have a healthy downstream estuary.
Which brings me to my final point. I have been an integral part of this conversation for over 16 years. This has always been viewed as a two step process. We want an AEIS to learn all we can so we can do a better job of managing these impacts. However we have always recognized the need to follow the AEIS with a natural resource management plan. This industry needs to have an overall regulatory plan just like every community must have a comprehensive plan. Industry representatives have told us all for years that phosphate mining is a finite industry in this state. The day will come when all of the economically feasible phosphate has been mined and they will be gone. I want to know that I will still have a healthy vibrant estuary when they are gone. Only with that healthy vibrant estuary can my community have a healthy vibrant economy. We need to have the same assurance from this industry that we are assured from every other economic activity in this state. A successful natural resource management plan including maps of what is and isn’t on the table for consideration of mining permits and the terms under which they would be considered appears to be the most effective way to achieve that public necessity.
At this point I would like to add an additional observation I failed to mention during my comments. Charlotte County and our neighbors spent over $12 million and years of effort to research this issue, improve regulation and enforce existing laws. We gained a great deal of improvements in the management of this resource and the impacts the mining created. Unfortunately after a shift in political winds caused Charlotte County to stop challenging these permits, the very next permit application in the form of the South Fort Meade mine extension undid virtually all of the gains we made. The actions of the industry, the state and the local government stakeholders in this matter have made it perfectly clear that they will make no improvements that are not forced upon them. If the federal government does not enforce the clean water act and other environmental requirements, no one will. We need the EPA and the Army Corp to step up to the plate and ensure the health of this national estuary and our local economy as a result.
Thank you.
Regards,
Adam Cummings
Former Charlotte County Commissioner
Mosaic in Face Off
Mosaic Faces Off With Environmental Groups Over Florida Mine
“What happens in this particular case may determine how much, and in what way, they continue to mine this entire area,” Huber said.
By Ian Berry, OF DOW JONES NEWSWIRES
Mosaic Corp. (MOS) is facing off with environmental groups in Florida so it can maintain output of a key fertilizer component.
The fertilizer maker has secured water permits necessary to expand its mining operations in central Florida. Yet Mosaic, the world’s largest producer of phosphates, is fighting an injunction issued by a federal judge last summer after the Sierra Club and local environmental groups accused the U.S. Army Corps of Engineers, the issuer of the permits, of violating clean-water requirements.
At stake when the two sides return to court next month is about a third of Mosaic’s phosphate production. The Plymouth, Minn. company is experiencing growing demand for fertilizer made from the raw material as farmers try to keep pace with booming global food needs. Phosphate along with nitrogen and potassium, or potash, have drawn increased attention from governments and investors illustrated last year by a $38.6 billion bid byBHP Billiton (BHP) for Potash Corp. of Saskatchewan (POT), a rival of Mosaic.
Mosaic plans to expand its mine in South Fort Meade, Fla. by 11,000 acres as production from the existing acreage dwindles. Investors expect the mine to keep operating, with earnings projections by stock analysts not factoring in the costs of production losses, said Horst Hueniken, an analyst with Stifel Nicolaus in Toronto.
“The collective wisdom of investors is this place is not shutting down,” he said.
Hueniken estimated the mine’s closure could add up to $690 million in annual costs for Mosaic based on current market prices for phosphate, which the company likely would have to buy to replace the lost capacity. Phosphate currently sells for about $150 a ton.
In a recent interview, Mosaic Chief Executive Jim Prokopanko expressed confidence the company would prevail, saying the injunction has a “slim to nil” chance of being upheld on appeal. The company expects to prevail on the overall lawsuit as well.
At issue in the case is whether the Army Corps issued a permit for the mine expansion too hastily and violated the Clean Water Act. The Sierra Club and local environmental groups sued to stop the expansion, saying it could contaminate drinking-water supplies and fisheries in the U.S. Gulf of Mexico, which is connected to the site through a network of swamps and streams.
The Mosaic mine is about 80 miles southwest of Orlando nearly smack in the center of the state. Phosphate deposits have long been mined in Florida, and the state accounts for about 25% of world production.
Sierra Club attorney Eric Huber dismissed Prokopanko’s confidence on the appeal as “puffery.” On average, only 10% of trial-judge rulings are overturned in the U.S. Court of Appeals for the 11th Circuit, where Mosaic’s appeal is being heard, the Sierra Club said.
“What happens in this particular case may determine how much, and in what way, they continue to mine this entire area,” Huber said.
Prokopanko said the Army Corps spent three years examining the company’s permit request, and that work shouldn’t be stopped by a single judge who looked at the case for a couple of days.
“This country would come to a screeching, roaring halt” if such decisions were allowed to stand, he said.
The federal appeals court will hear Mosaic’s appeal of the injunction April 4. A ruling isn’t expected for at least a month and could take four to six months.
For now, Mosaic can continue a 200-acre expansion of the mine, which will be depleted in May. After that, Prokopanko said the company could mine a 1,000-acre area for about 18 months while the case is heard, if need be. Mining the area will come at a higher costs, but will avoid wetlands on which the court case focuses.
CF Industries Holdings Inc. (CF) also mines phosphate in Florida. Chief Executive Stephen Wilson in July said the case was “a troublesome situation,” but noted CF has fully permitted mines that will last through the next decade.
-By Ian Berry, Dow Jones Newswires; 312-750-4072 ;
[email protected]
Florida Mine Battle Looms
Mosaic’s ‘Phos-Fate’: Florida Mine Battle Looms
By Scott Eden – 03/10/11 – 5:50 PM EST
Tickers in this article: CF VALE POT MOS
(Updated with response from Mosaic on the contested permit for the expansion of its Four Corners phosphate mine.)
NEW YORK (TheStreet) — The future of the Florida phosphate industry could hang in the balance early next month when a federal appeals court in Atlanta convenes to hear a set of arguments that pits two ancient adversaries — environmentalists vs. big business.
At the center of the dispute sits Mosaic(:MOS). Based in Plymouth, Minn. — 1,400 miles from its operations in the Sunshine State — the global fertilizer giant takes more phosphate out of Florida’s rich peninsular loam than any other company by far, accounting for about half of the nutrient produced in the U.S. in recent years. (Potash (:POT), a distant No. 2, accounts for about 25%, though most of that comes from North Carolina, not Florida. CF Industries(:CF) is third, with 11% of U.S. production).
The phosphate industry in Florida has long been controversial. Since modern dragline excavation techniques, capable of eating acres each day, came into use in the 1940s, it has strip-mined hundred of square miles of watershed in the center of the state, mostly from a region dubbed the Bone Valley by locals — excavations that have, on occasion, dried up rivers, critics and scientists claim. Its tailings have been poured into enormous, semi-toxic settling pools that have been known to spring leaks. The processing of phosphate rock into fertilizer produces radioactive gypsum, a byproduct that now covers about 3,400 acres, rendering it unusable.
But phosphate rock also happens to be the source of one of the world’s most important and effective plant nutrients — a substance that has taken on new relevance, rising to the level of national security, at a time of burgeoning fears over global food shortages. (Indeed, the element phosphorus is one of the fundamental building blocks of life).
For decades, the controversy in Florida remained little more than loud talk by local environmentalists who clashed in vain with Fortune 500 corporations. (The industry mined without any regulation at all until 1975.) But just within the last six months, all that seems to have changed. A series of lawsuits over mining permits has threatened to imperil Mosaic’s financial health.
In July last year, several local environmental and community groups, including a Florida chapter of the Sierra Club, sued to block Mosaic’s plan to expand its South Fort Meade mine. The company already has exhausted the rest of the plot. To lose the expansion then, would mean to lose between 4 million and 6 million metric tons per year of phosphate-rock production, or 32% of the company’s total output in its fiscal 2010.
Mosaic applied for permits to dig the nearly 11,000 acres of the South Fort Meade extension as far back as 2003. It took eight years to line most of them up, and by June 2010 it had received the last, from the Army Corps of Engineers, responsible for granting mining permits for areas delimited as wetlands.
For many years local environmentalists had urged the Corps to conduct an areawide impact study — one that would examine the effects of phosphate mining on the whole region, from the central Bone Valley all the way to the coast, where the waters of the valley empty via the Peace River and its tributaries into an enormous estuary called Charlotte Harbor, just north of Fort Meyers. A large-scale study of this kind hadn’t been done since 1978.
Environmentalists fear that the strip-mining has shredded the wetlands system that feeds those rivers — and, thus, the harbor.
“That’s our economic magnet down here,” says Jim Cooper, a retired Air Force pilot and the head of a local environmental group called Protect Our Watersheds. “They’ve never truly looked at the impacts on the downstream counties.”
When the Corps granted the permit without, once again, calling for a study, the group sued the Corps. According to the complaint, the environmentalists want the permit revoked until an areawide impact study yields its findings.
In July, a federal District Court in Jacksonville ruled partly in favor of the plaintiffs — enough of a victory that the court also issued a preliminary injunction that blocked Mosaic from proceeding with the South Fort Meade extension while it considered the environmentalists’ case. Within days, Mosaic appealed the injunction with the 11th Circuit court in Atlanta. The appellate will hear oral arguments from both sides in a one-day proceeding, scheduled for the week of April 4.
There has been at least some room for compromise. A settlement reached in October — after the Atlanta court forced the parties to sit down in mediation — allowed Mosaic to mine 200 acres of South Fort Meade, enough for about four months worth of mining, or 900,000 metric tons of phosphate rock. In return, the company agreed to leave a 40-acre piece of wetlands untouched. Mosaic is close to finishing those 200 acres.
As it turns out, as well, Col. Alfred Pantano of the Jacksonville district of the Army Corps of Engineers ordered a new areawide study this past summer. It’s expected to take a year and a half to complete.
Mosaic has long defended itself as you would expect a multibillion-dollar company to defend itself: with vigor and with a platoon of lawyers. In 2008, Manatee County in Florida denied the company a permit to mine on 2,000 acres — an extension to Mosaic’s other big mine in Bone Valley, called Four Corners. The county worried that the new operations would damage the community’s primary source of drinking water. Mosaic sued Manatee County for $618 million. (That was the difference, the company said, between the value of the tract as a mineable and un-mineable piece of Bone Valley land.) Manatee County’s board of commissioners soon reversed its position.
Mosaic’s official public stance when it comes to South Fort Meade is that this will all break in its favor. “We will be mining at South Fort Meade, and we’ll be at or close to full capacity there once we work through these legal issues,” Mosaic’s finance chief, Larry Stranghoener, told TheStreet in an interview. “That’s our expectation.”
Meanwhile, however, the company has pursued backup plans. Last year, it spent $385 million to buy a 35% stake in a new Peruvian phosphate mine majority owned by Vale(NYSE:VALE). Mosaic is slated to receive only 1.5 million metric tons of phosphate rock from Peru this year — not nearly enough to make up for the potential loss of South Fort Meade’s 4 million to 6 million tons.
To meet customer demand for its phosphorus fertilizers, Mosaic would boost production at one of its other mines, such as Four Corners, which sits adjacent to the Fort Meade tract. Most likely, though, it would need to shop overseas, in Morocco, which has come to rival Florida as the most phosphate-rich patch in the world, and buying from third-party miners on the other side of an ocean is far more expensive than simply digging it out of the Bone Valley. Mosaic’s profit margins would be squeezed.
“It’s critically important to us,” Stranghoener said. “It’s our largest and lowest cost rock mine. It produces about 35% of the rock we need. If we don’t have access to rock from that mine — which is not an outcome we expect — it would have a significant impact on our operations. And we’ve been making that very clear to people.
“I would also say, though, that we have a lot of ways to ensure that we’ve got the rock we need to continue to produce phosphate product,” he went on. “So I don’t want to minimize it. It’s a big deal. But we’re confident in the outcome of the underlying legal case and that we’ll move forward.”
Some on Wall Street say that investors already have discounted Mosaic shares to account for the total loss of South Fort Meade. Edlain Rodriguez, a stock analyst for Gleacher & Co. in New York, says he’s already removed the mine from his earnings estimates for Mosaic.
“You kind of assume the status quo, that they’re not going to produce much from that mine. And if this thing goes away, it goes away,” he said.
Depending on phosphate prices, he says, a fully functioning South Fort Meade extension would be worth 30 cents to 50 cents a share each year in net income. That would add about $5 to the company’s share price, he estimated.
Others have a somewhat more jaundiced view. Chris Damas, a trader and analyst at BCMI Research in Toronto, who specializes in natural-resource and agricultural stocks, believes Mosaic’s phosphate business in Florida has turned “toxic” because of the permitting problems as well as potential environmental liabilities.
Mosaic discusses these issues in the lengthy “legal proceedings” sections of its regulatory filings with the Securities and Exchange Commission. The company says it takes its “evironmental stewardship responsibilities very seriously.” According to Stranghoener, “Once we’re done mining, we restore the land to a better condition than what it was before we started mining. And we spend a great deal of money to do that.”
More than just the fate of South Fort Meade hangs in the balance in Atlanta. The same Sierra Club-led group has sued the Army Corp of Engineers over its earlier granting of a permit for the expansion of Mosaic’s Four Corners mine, which produced 5.6 million metric tons of phosphate rock in fiscal 2010, or 42% of the company’s output that year. It’s the same place that Mosaic forced Manatee County to back away from, through its $618 million lawsuit.
Though Mosaic has continued to mine there without interruption, the Sierra Club litigation is still pending. The court, in essence, has twinned the two cases — South Fort Meade and Four Corners, which together make up 76% of the company’s annual estimated phosphate capacity — and has told everyone to sit tight, pending the appellate court decision in Atlanta. Whether Mosaic can mine in Florida at all may come down to the outcome of the hearings in April.
Until that decision is made, Mosaic investors will have Florida on their minds.
A Mosaic spokesman, however, offered this clarification: Even if the permit for the Four Corners expansion (called the Altman tract) were revoked, it wouldn’t reduce the company’s phosphate output at the mine. Mosaic would simply move the dragline at Altman to another, nearby phosphate reserve that is fully permitted and ready to go, of which the company has several.
— Reported by Scott Eden in New York
>To contact the writer of this article, click here: Scott Eden.
>To follow the writer on Twitter, go to http://twitter.com/ScottEden.
>To submit a news tip, send an email to: [email protected].
Tickers in this article: CF VALE POT MOS